CLIENT
DARLINGTON BOROUGH COUNCIL
ARCHITECT
SPACE ARCHITECTURE
TYPE OF CONTRACT
PARTNERING NEC OPTION D
“It now seems strange not to have the Contractors on site. It is a testimony to their approach to this project that, in effect, they seemed to become members of the school staff known to students and staff, attending social events and presenting awards at assemblies and prize evenings”. Pat Howarth

 

HEADTEACHER
HUMMERSKNOTT ACEDEMY, DARLINGTON
The project was phased over two years and designed to provide new build accommodation to the existing secondary school as well as major refurbishment and remodelling of areas of the existing 1950’s building.

 

The school remained fully operational throughout the works and phasing/sequencing and segregation of the works was of the utmost importance.  Our site team was in constant liaison with the school representatives to ensure the works were carried out with a minimum of disruption.  We received positive comments in both the Considerate Constructor Scheme Monitor visits and Ofsted report.

 

The whole project was completed within budget and planned        programme period of 24 months.

The scheme gained an enviable 36 score and a awarded a bronze award with the Considerate Constructors Scheme.