The project work involved the construction of a new 25m swimming pool with a moveable floor in steel framed construction, together with alterations to the existing leisure facilities.
The project work involved the construction of a new 25m swimming pool with a moveable floor in steel framed construction, together with alterations to the existing leisure facilities.